Tuesday, July 21, 2009

Where have I gone to

Some of you may have wondered where I have gone; well, the answer is: deep into kitchen renovation. About a month ago now our plumbing gave under the sink leaving a flood in my kitchen and we decided to take this opportunity to renovate instead of just patching up a kitchen that was already in shambles.

My mom and dad are down from NB helping (thank you so much). 3 weeks into the reno, my dad is now working on getting the floor ready for my new cork floor. The walls are up and painted; same goes for the ceiling.

I wish we could have done the full kitchen eco-friendly but cost restriction and timing prohibited us from doing so. However I did consider the enviroment at many points in the kitchen reno; below are some of the decisions that we made that are in part green.

  1. Cork Floor: When cork is harvested the tree is not destroyed and then replanted but rather the bark is trimmed from the tree every 9 years, leaving the tree and the forest undamaged. Its not unusual to have a 200 year old tree still producing cork bark. Cork flooring is actually made from the waste of the cork wine stopper manufacturing process so cork flooring is a recycled product.
  2. Sico Go Prime Duo 100% Acrylic Latex Primer- Sealer and Undercoat: This is a great all purpose primer with less then 78.38g/L of VOC's. I knwo there are some primers out there that have 0g/L VOC however we had some primer left over from a previous project and in our time restraints could not get our hands on anything that had a lower VOC count.
  3. Sico Paint Chamois: This is a 0g/L VOC paint; however the tint does add some VOC, the darker your paint the more VOC in it. Once again I know more eco-friendly options exist but we had all the paint we needed left over from previous projects.
  4. I would have loved to get a LED light fixture for the kitchen but the up front cost is too much for us; instead we got a light fixture that could accomodate a compact florecent bulb. When chosing your light fixture make sure to always double check that a compact fluorescent bulb will fit, they are bigger then their incandescent conterparts.
  5. We are reusing our existing cabinet pulls. We don't have enough to do the full kitchen so the uppers will have the old pulls reused and the lowers are going to have new pulls giving the kitchen a unique fun look.
  6. An Ikea kitchen we chose Ikea for a few reasons first they are inexpensive secondly they do have a good enviromental practice. Ikea is not perfect but they do try harder then many companies out there to find out more check out : http://www.theikeaway.ca/en/home.html.
I found a great website with information on non-toxic painting if anyone is interested:
http://www.eartheasy.com/live_nontoxic_paints.htm#2d

Tuesday, September 9, 2008

On Tongues and Grooves: Hacking Bamboo Flooring

Way back in February, before Christophe came along and took primary position in my spare time, I was installing bamboo flooring in our house.  The bamboo flooring we have is tongue-and-groove (as opposed to click floating flooring, for instance).  One of the things you'll discover if you lay any significant amount of bamboo flooring is that you'll find yourself with a piece that is more than suitable for a particular location, other than the fact that you've already cut the groove off that piece, and a piece with a groove is required to fit into the tongue of the previous piece within that same course.
That's usually no big deal - that piece becomes a good starter piece for a subsequent course instead.  That works as long as you don't get heavily over-subscribed in starter pieces, but you may also find a time when you have neither tongue nor groove on an otherwise usable piece of flooring.  What's a homeowner to do?

In this case, I discovered that our  cheap table saw makes a fine groove.  It takes careful aim and tweaking to get the groove cut, and it's not likely to be perfect, but it doesn't need to be.  The groove is entirely invisible supporting infrastructure for the flooring, so the fact that it may be a little wider than it needs to be or slightly rough is irrelevant, as long as the previous tongue fits into the groove and you haven't weakened the material to the point of irrelevance.

This is surprisingly painless to do, so i'm happy to recommend the process for anyone laying bamboo floor.  If I have to do another one, perhaps I'll capture some video.

Wednesday, August 13, 2008

Looking Back: January 28th

Almost eight months ago now, I was trying to finish the flooring in the nursery before the little guy came along. Sadly, that was not to be. These are cleat nails, driven through flooring using a pneumatic nailer. You can see a chunk of a row of nails, ready to go into the nailer, as well as a single nailhead in the tongue of the bamboo I was laying, on top of the red rosin paper I was using as an underlayment.

Three more boxes of flooring ready to get laid down. One of these is still unopened, the other is half-used as I finish the floor upstairs. Pierrette already had the closet organized:
Finally, a bamboo plank where you can see the tongue clearly, sitting on top of the red rosin paper:

Saturday, February 23, 2008

December Renovation Review

Back in December, we were still doing some tear-down. In the upstairs hallway, I'd peeled back the layers 'til we got to this nice plank subfloor. A little squeaky, but authentic. On top of it was really thin 1/4" ply with some strips around the edges, which I decided to replace:


Downstairs, we still had linoleum and carpet, which we'd just gotten clearance to replace without worrying about asbestos, which was great news:


Mostly, pulling the linoleum was as simple as sticking a prybar under it, hitting it with a mallet, and then prying:

Although you had to be careful not to lose a cat into the cold air return where they could go climb into the furnace ...
Once the linoleum was pried up, I cut it in strips and sealed it with duct tape to be trashed.


The carpet was broadloom rolled-goods, held down with a transition strip that was no match for a prybar:
Although the underpadding revealed some more of our friendly neighbourhood carpet-wormy things.
At the transition to the kitchen, I discovered that the kitchen may have a layer of christmas tiles, red and green. I'm not sure who thought that would be a good idea.
The subfloor was covered with ply, and the ply had some crusty layer of paint or possibly adhesive that I could easily scrape off with the prybar:

So, that's where we were in early December. Things have come a long way in the last month or two.

Sunday, February 17, 2008

Finishing the Living Room

I've been working on the living room for the past few weekends. On February 9th, I was almost finished, but we had to go off to a shower (more on that later). When I sink a cleat flooring nail most, but not all of the way into a board, it's very difficult to remove without damaging the flooring, and they're very difficult to drive all the rest of the way in with a nail set, so I'd struggled with a few of these before Shawn suggested that I use a Dremel to cut off any exposed nail surface. That has worked fairly well, so I've been using that strategy ever since. It throws a lovely shower of sparks. I'm not sure what causes some of the sparks to fork in mid-air, but it does make for a good picture.

When you can use the pneumatic flooring nailer, it makes fairly quick work of installing flooring. I'm able to do about three courses in an hour in the living room, and I'm still pretty new at it. When I can't use the flooring nailer, it takes a lot more time. As you get close to the wall, you run out of room, and you need to use another strategy.

Initially, tried using Shawn's brad nailer for this, but it's just not accurate enough for my tastes, and at times the brad nails deflect. Perhaps with a very accurate sense of where the nailer will drop the nail (or a nailer that makes that more apparent) and fewer deflections (better nails? better nailer? not sure...), I'd go this route.

For my uses, though, I only have so much flooring to do, and I found it simpler to pre-drill, put in a spiral nail, and nail-set it. Takes a while, but it takes longer to brad-nail a strip of flooring and then take it out again when it gets screwed up.

Monday, February 11, 2008

Tiling (22-Jan)

So, although we'd been prepping for it for a few days before, on Tue 22-Jan-2008, we finished the tiles. I wasn't expecting it to be noisy, so I started them after work. Unfortunately, in order to set the tiles in place, they suggest that you whack them with a mallet, which is, perhaps not surprisingly, noisy.

So we checked with our neighbours to ensure that it was ok that we continue despite the noise, after the noise limit (7pm). It mostly went well, other than one tile that cracked as we tried to set it, and required a last minute replacement. We were also not able to get the first two tiles completely level, as I probably used a little too much mortar on those. It's also surprisingly difficult to lift a tile from mortar to put it down. It's suggested that you periodically lay a tile then lift it up to check coverage of the mortar, but that's difficult to do when it feels like it's being held down by super-powered suction cups.

Still, all things considered, I'm happy with the results. This is the tiles laid, in mortar, no grout, with tile spacers.

Here's a closeup of a tile spacer in position between four of our tiles:

And finally, my loving wife, with mortar on her knees, threatening to step on the tiles before they're set.

This post is a little late, but I've been busy doing the work instead of posting about it.

Friday, January 25, 2008

Hallway Flooring Retrospective

This is from back in December, again. It's the flooring in the hall outside the bathroom. Underneath the carpet and the vinyl tile, there was this odd snakeskin vinyl rolled goods, with some kind of coconut-husk-y backing. Underneath that was old linoleum/marmoleum, 1/4" thick, flexible, and with a nice green stripe to it.

Underneath that, some plywood - subfloor/underlayment on top of the plank subfloor. The ply didn't go to the edges, so we ripped that up and put in new 1/4" fir ply. Once I finish sanding down the underlayment/subfloor on the bathroom transition, it'll be ready for a little leveling compound/crack filler, and the new bamboo.

Saturday, January 19, 2008

This week

Both Geoff and I have been very busy during the past week.

Geoff has been working hard on the house getting almost all the underlayment for the floors complete. We picked up from friends all the tools necessary to complete the floor, a compressor, a floor stapler, a water saw... (a thank you goes out to Shawn, Kregg, Deanna and Ed)


On Wednesday our new fridge arrived. Yippy for us.



Today I work on my picture wall. At the top of the stairs we are hanging a selection of frames that will end up covering most of the wall. All I need to do now is wait till we put in the corner shelf to hang the rest of the frames to make sure they are all nice and snug to the shelves.




I also spent a large chuck of the week cleaning up the chaos let behind from both Geoff and I being sick. Now I am relaxing while Geoff is finishing up the dishes, I think I must of done 5 loads of dishes during the past 2 days so I decided it was Geoff's turn.

This morning baby finally decided to let us hear his heart beat. We bought this weird baby listening device that was absolutely not working for us now for almost 2 months, but this morning finally we got it. It was like we struck gold after trying for so long. I will take more about this next time.

Saturday, January 12, 2008

Busy Month for Daddy

(Posting from Pierrette's Laptop, even though this is Geoffrey; more on that in the next paragraph.)

It's been a busy month so far.  While working from home on the holidays, my laptop brick died, and Best Buy will only repair the unit as a whole, so I had to ship out the entire laptop so that they can fix a defective power adapter.  That, or pay $150 for an adapter that they will fix for free on a laptop that only cost $699 to begin with.

So my laptop's in the shop, and with it, some of the photos I was planning to post here.  If they fry my HD while fixing/replacing the power adapter, I'll be very irritated, but there wasn't a good solution to backup the HD while I was running out of battery power, and their $80 backup didn't appeal to me.

After that, I really focused on the renovation, tearing up the flooring on the main floor to make way for the bamboo.  I carried an 8x12' 1/4" plywood panel home from Home Depot to acclimatize for new subfloor - not yet sure if it's enough, but it's a start.  Also took the fan off the ceiling in the bedroom since the light has stopped working - either I've gotta diagnose it, or we've gotta replace it.  Either way.

Then I got the flu - fever for several days, lots of sleep, not much else.  Yesterday, I recovered enough to return to work and then we spent the evening picking up 13 boxes of composite vertical strip bamboo flooring from Rona in Ed's van (Thanks, Ed!).  I know I'm recovering because I'm no longer able to sleep all day every day - so I was up 'til 2am reading about tiles and transitions (tiles should probably have a backerboard, rather than simply subfloor - so subfloor, thinset, backerboard, optional membrane, thinset, tiles; thinset for porcelain needs to be premium latex-modified, unless you're using schluter ditra, at which point they recommend unmodified thinset, etc.)  Adding to all this, Pierrette had heavy heartburn and was running low on liquid cal-mag, which wasn't working, so I went out to get her some Tums at 3:30, after doing a quick round of research on what heartburn medicine was ok for pregnancy (stick to chewable calcium carbonate, mostly).

So it's a late start to Saturday, after a long night.  Time to go eat breakfast and get on to cutting some subfloor (outside, I hope, if the weather co-operates).

Monday, December 3, 2007

Nursery Flooring Reno

Still working on the renovations in the nursery. The crown molding is almost done; the splices have been patched with wood filler (yellow), and the corners and top and bottom seams are caulked (white). The caulking might not be necessary if the ceiling was level and walls flat, but, well, welcome to the joys of an old house.

If the crown wasn't high up, I might need another round of wood filler to get it really perfectly flat/smooth at the splices, but it's good enough for something that'll be painted and well above eye-level. Still another coat of trim paint required, but getting close.



I cut the carpet into strips. Underneath that, there was foam underpadding, which I also cut into strips. The foam underpadding seems as if it as made by chopping up a bunch of different kinds of foam and then recycling them into a new sheet of foam - there are all sorts of colors and textures in the one sheet. Rolled both the carpet and the foam up into cylinders, tied them at the ends, and put 'em outside.



Underneath that, there's a layer of faux-wood vinyl tiles. You can see these layers here.



The tiles are pretty ugly, but I guess that comes with age. They came up relatively easily: I inserted a thin prybar under each tile, shoved it around to loosen the adhesive, then lifted. Some of the edges were stuck a little more firmly with the adhesive, others nailed down with a few finishing nails at the edge, probably because they started to lose their grip over the years. All in all, it could have been worse.



The adhesive is a thin coat over some kind of wood - I'm guessing this is the sub-floor, but I'll know better when I can see all the layers -- which should be possible where the layers reach the stairs. If it's the subfloor, we'll clean up that layer a little and then lay the bamboo down over that. If there are more layers under that, I might still have some more demolition to do.



Two or three tile sections had some kind of marking on them that's held up over the years, as if it's heat or water damage. Not sure what caused them, but it doesn't matter since the tiles are coming up anyway. The floor underneath doesn't show any sign of damage, so whatever it is, it's a surface thing. I'm curious, but not curious enough to try and dig any deeper.



The carpet was held down at the edges with tack strips, like the one pictured here. "Premium Carpet Strips," they're labelled.



The carpet strips held one last surprise -- beside a good five-foot stretch of the carpet strips were a family of little wormy bugs, and some discarded wormy skins. Not sure how they were surviving down there, since nobody eats food up there, and underneath a firm layer of carpet, doesn't seem like there'd be much to survive on, but ... well, I guess that's one more reason not to have carpet. Just hope there's no little family of worms living under your carpets, I guess.

The nursery


Geoff working hard on the nursery. On the weekend he started the floor. The painting is almost all done, just needs to touch up the trim once the old floor is ripped out.

On the other hand, I have been sick now for a few days. I missed work on Friday and then again today. This morning I felt like a truck ran me down. I am starting to feel better. My head is all stuffy and my muscles are a bit achy. Not much you can do other then sleep and rest. Most drugs are bad for baby unless you have a fever and thank god I never developed one. Baby's temperature is higher then yours so a even a slight fever can be dangerous to baby.

Saturday, August 11, 2007

Busy Weekend

Busy weekend so far; I've been priming and painting the bathroom door, and working on applying and sanding drywall compound. In between, I went up to the Taste of the Danforth, had some lunch, stopped by Home Depot on the way back, and watched The Prestige from TMN.

Tomorrow, more sanding and drywall compound to apply; if the door's dry, I may take it out back and apply more paint (once it's out of the house; Pierrette's coming back tomorrow evening, and we'd prefer not to subject her to paint fumes).

Friday, August 10, 2007

A Weekend of Renovation

I'll be renovating this weekend. Not that that's much different than any other weekend, but Pierrette is aiming to spend the weekend at my Tara's (my sister), so that I can focus on renovation and painting without any VOCs or other such toxicities affecting her.

That means I should be able to get more done than usual, assuming I don't tire myself out too quickly. Fingers crossed. I'm hoping to finish most of the mudding (drywall compound) and sanding, and paint the bathroom door, but ... we'll see how it goes.